
Subdivision Housing · Santa Rosa City, Laguna
Villa Verde Residences – Phase 2
Twenty-four Amara townhouses for a subdivision in Santa Rosa, Laguna, built and handed over house by house. The first owners of Block 1 moved in this October.
Projects
Projects our clients have let us show: where each one is, what kind of work it is, and how far along it stands today.
Projects
12 published, 2 on site now. Money and clients are never shown here.

Subdivision Housing · Santa Rosa City, Laguna
Twenty-four Amara townhouses for a subdivision in Santa Rosa, Laguna, built and handed over house by house. The first owners of Block 1 moved in this October.

Building · Lingunan, Valenzuela City
A steel-framed warehouse extension in Valenzuela City — a new slab-on-grade, a long-span roof and a hardened floor ready for racking. Handed over in September 2026.

Building · Brgy. Paligsahan, Quezon City
A five-storey reinforced-concrete commercial building on Quezon Avenue — shops on the ground floor, offices above. The frame is rising a floor at a time.

Condo Fit-out · Alabang, Muntinlupa City
Six treatment rooms, a sterilisation room and the reception of a dental clinic in Alabang — partitions, ceilings, floors and the dental services rough-in.

Building · Brgy. East Kamias, Quezon City
A six-storey office building on Kamias Road, Quezon City — structure, envelope, finishes and MEPF coordination, handed over on its contract date.

Condo Fit-out · Bagumbayan, Quezon City
A bank branch in Eastwood City fitted out in eleven weeks — the teller line, vault-room partitions, ceilings and lighting, worked at night around the mall's hours.

Subdivision Housing · Santa Rosa City, Laguna
Thirty-two Amara townhouses, the first phase of Villa Verde in Santa Rosa, Laguna — the job that brought the developer back to us for Phase 2.

Subdivision Housing · General Trias City, Cavite
Twenty rowhouses for the third phase of Maple Grove in General Trias, Cavite — built through the quarantines of 2020 and 2021 and turned over unit by unit.

Condo Fit-out · Ortigas Center, Pasig City
Two office floors in Ortigas Center fitted out in fourteen weeks — partitions, ceilings, flooring and the electrical — for a shared-services team of three hundred.

Building · Malolos City, Bulacan
A four-storey medical arts building in Malolos, Bulacan — doctors' clinics, a diagnostic floor and the medical gas rough-in. Handed over in July 2019.

Subdivision Housing · Antipolo City, Rizal
Thirty-two single-attached houses on a sloping site in Antipolo, Rizal — retaining walls, terraced lots, and every house turned over to its owner on its own punch list.

Building · Imus City, Cavite
A three-storey school building in Imus, Cavite — eighteen classrooms, a library and a covered court, handed over in time for the June 2017 school opening.
Send the drawings, or ask for a site visit first. An estimator replies within two working days.
Request an estimate