Built, and being built.

Projects our clients have let us show: where each one is, what kind of work it is, and how far along it stands today.

SheetA-200
TitleWORK ON RECORD
Scale1:100
RevOCT 30, 2026

Projects

Every project on record.

12 published, 2 on site now. Money and clients are never shown here.

Villa Verde Residences – Phase 2, Santa Rosa City, Laguna

Subdivision Housing · Santa Rosa City, Laguna

Villa Verde Residences – Phase 2

Twenty-four Amara townhouses for a subdivision in Santa Rosa, Laguna, built and handed over house by house. The first owners of Block 1 moved in this October.

Work done42%
S-001Ongoing
Mabini Warehouse Extension, Lingunan, Valenzuela City

Building · Lingunan, Valenzuela City

Mabini Warehouse Extension

A steel-framed warehouse extension in Valenzuela City — a new slab-on-grade, a long-span roof and a hardened floor ready for racking. Handed over in September 2026.

S-002Turned over 2026
Lumina Commercial Building, Brgy. Paligsahan, Quezon City

Building · Brgy. Paligsahan, Quezon City

Lumina Commercial Building

A five-storey reinforced-concrete commercial building on Quezon Avenue — shops on the ground floor, offices above. The frame is rising a floor at a time.

Work done44%
S-003Ongoing
Southridge Dental and Wellness Fit-out, Alabang, Muntinlupa City

Condo Fit-out · Alabang, Muntinlupa City

Southridge Dental and Wellness Fit-out

Six treatment rooms, a sterilisation room and the reception of a dental clinic in Alabang — partitions, ceilings, floors and the dental services rough-in.

S-004Turned over 2025
Kamias Corporate Center, Brgy. East Kamias, Quezon City

Building · Brgy. East Kamias, Quezon City

Kamias Corporate Center

A six-storey office building on Kamias Road, Quezon City — structure, envelope, finishes and MEPF coordination, handed over on its contract date.

S-005Turned over 2024
Mabuhay Savings Bank – Eastwood Branch Fit-out, Bagumbayan, Quezon City

Condo Fit-out · Bagumbayan, Quezon City

Mabuhay Savings Bank – Eastwood Branch Fit-out

A bank branch in Eastwood City fitted out in eleven weeks — the teller line, vault-room partitions, ceilings and lighting, worked at night around the mall's hours.

S-006Turned over 2023
Villa Verde Residences – Phase 1, Santa Rosa City, Laguna

Subdivision Housing · Santa Rosa City, Laguna

Villa Verde Residences – Phase 1

Thirty-two Amara townhouses, the first phase of Villa Verde in Santa Rosa, Laguna — the job that brought the developer back to us for Phase 2.

S-007Turned over 2022
Maple Grove Residences – Phase 3, General Trias City, Cavite

Subdivision Housing · General Trias City, Cavite

Maple Grove Residences – Phase 3

Twenty rowhouses for the third phase of Maple Grove in General Trias, Cavite — built through the quarantines of 2020 and 2021 and turned over unit by unit.

S-008Turned over 2021
Emerald Avenue Office Fit-out, Ortigas Center, Pasig City

Condo Fit-out · Ortigas Center, Pasig City

Emerald Avenue Office Fit-out

Two office floors in Ortigas Center fitted out in fourteen weeks — partitions, ceilings, flooring and the electrical — for a shared-services team of three hundred.

S-009Turned over 2020
Northpoint Medical Arts Building, Malolos City, Bulacan

Building · Malolos City, Bulacan

Northpoint Medical Arts Building

A four-storey medical arts building in Malolos, Bulacan — doctors' clinics, a diagnostic floor and the medical gas rough-in. Handed over in July 2019.

S-010Turned over 2019
Hillcrest Homes, Antipolo City, Rizal

Subdivision Housing · Antipolo City, Rizal

Hillcrest Homes

Thirty-two single-attached houses on a sloping site in Antipolo, Rizal — retaining walls, terraced lots, and every house turned over to its owner on its own punch list.

S-011Turned over 2018
St. Anthony Learning Center, Imus City, Cavite

Building · Imus City, Cavite

St. Anthony Learning Center

A three-storey school building in Imus, Cavite — eighteen classrooms, a library and a covered court, handed over in time for the June 2017 school opening.

S-012Turned over 2017